![](https://service.polebicycles.com/wp-content/uploads/2022/07/Pole-Stamina-Torque-Values-640x452-1.jpg)
Part | Torque |
1. YOKE BOLTS ON UPPER LINKAGE (5mm HEX key), M8 | 8-10 Nm |
2. UPPER AND LOWER LINKAGE BOLTS (6mm HEX key), M18 | 15-20 NM |
3. UPPER LINKAGE FASTENER (DUB BB TOOL), 1,375” X 24TPI | 25-30 nm |
4. SHOCK MOUNT AND YOKE BOLTS (5mm HEX key) , Ø8MM | 8-12 Nm |
Apply Park Tool ASC-1 grease on threads and Park Tool HPG-1 grease on the axle surface.